It's all assembled but my bottom slider vents...need a extra set of hands i'll have later. As soon as the vent controls go on it's time for it's virgin seasoning. I left the drum lid polished metal and will keep it good and seasoned w/ linseed oil. Starting to come together!
I had a spare drum lid and had cut the outer ring off of so i crimped up the edges and now i have a 19 inch ash pan for the bottom...will put a U bolt on that so i can grab it with the hook. Almost forgot i have to drill a hole for the Maverick probes, I was thinking of using a 1/8 pipe nipple w/ conduit nuts. Is that what some of you have done?
...and of course the most important piece!
I had a spare drum lid and had cut the outer ring off of so i crimped up the edges and now i have a 19 inch ash pan for the bottom...will put a U bolt on that so i can grab it with the hook. Almost forgot i have to drill a hole for the Maverick probes, I was thinking of using a 1/8 pipe nipple w/ conduit nuts. Is that what some of you have done?
...and of course the most important piece!